-
Main switches are switched off.
-
Sea-cocks of septic tank and toilet seat are closed.
-
Ensure that direct supply switches are switched on.
-
Bilge is empty of water.
-
Function of every bilge pumps.
-
Deck draining works properly and all draining valves are open.
-
All deck hatches, roof canvas and doors are closed tightly.